Gemini Bar®

Gemini Bar

Gemini Bar® is the elegant solution for full column grouted mechanical anchor bolts. It is a cold rolled, fully threaded bar made up of twin halves, resulting in a breather hole down its middle. An expansion shell is fitted to one end and at the other end a free running nut, seat, load indicator and bearing plate are attached. A short grouting tube with a gasket completes the assembly.

ADVANTAGES

  • Assured full column grouting
  • Immediately active support
  • Systemically the best support
  • More robust bolt - no need for cumbersome breather tubes
  • Easy & assured post-grouting makes it high-speed development friendly
  • Deformed on the outside for better grout to steel bonding
  • Lowest Total Cost of Ownership -can easily be adapted to a single pass system with lacing facility

SPECIFICATIONS

LengthsAvailable in standard lengths from 0,6m to 3,0m in increments of 0,3m. Non-standard lengths are available on request.   
Available
Sizes  
All threads are formed by a cold-rolled process available in left-hand format.    

 Nominal diameter (mm)

Major diameter (mm) 

Pitch (mm)  

14,5
20,0
16,5
 21,8 
5
  6  
Mechanical properties 

Nominal diameter (mm) 

Ultimate Tensilve Srength Mpa (min) 

Ultimate Tensile Load KN 

Elongation at Fracture % (min) 

14,5
20,0
600
 600 
100
180-200 
6-8
 6-8 

APPLICATIONS

  • As a full column grouted mechanical anchor in all development ends
  • Where dedicated crews can do grouting at a later stage, i.e. high speed development
  • In-stope use

PREPARATIONGemini remove plastic

  • Select an expansion shell with a diameter of not more than 5mm smaller than that of the hole
  • Slip off the plastic sleeve and ensure that at least 5mm of thread is protruding at the top end of the expander plug
  • When not using a spring-loaded expansion shell, expand the shell by pushing it further onto the bolt, until the leaves fit snugly into the hole.

 

ASSEMBLYGemini correct assembly

  • Ensure that the nut is free-running, with at least 3 threads of the bolt protruding at the bottom end
  • The spherical side of the seat must face the bearing plate, while the flat side faces the bolt
  • The hollow side of the bearing plate should fit against the rock
  • The narrow end of the grout gasket must enter the hole first
  • Check that the filler tube protrudes from the narrow end by about 20mm. Ensure the filler tube is threaded through the hole in the bearing plate.

 

INSTALLATIONGemini load indicator collapsed

  • Insert the assembly into a clean hole. Push the expansion unit to the back of the hole and force the conical gasket as far as possible into the mouth of the hole
  • Tension the bolt by using an impact wrench, rock drill or other suitable manual device. Correct tensioning has been achieved when the load-indicator has collapsed
  • The Gemini bar is now active and safe, allowing grouting to be undertaken immediately or at a later stage, if so required.

 

GROUTINGGemini tie off grouting tube

  • Pump a suitable grout through the short filler tube at a steady rate
  • As the grout rises up the drill hole, trapped air is displaced through the hollow section of the bolt
  • Reduce pressure once the grout starts to squirt from the hollow section
  • Remove the pump and immediately seal off the filler tube.

 

 

  Download Gemini Bar brochure

Product types:
Back to Top